Challenge

This large LGMF project called for interior and exterior metal framed walls as well as roof framing. The wide range of products required along with a tight construction schedule and shop drawing requirement left little time to waste.


Solution & Benefit

Due to the experience our engineers have in LGMF and the excellent communication thoughout the process with the framing contractor and other interested parties, we were able to submit the engineered shop drawing package in the time frame requested. Of course the wide range of products that Dietrich offers along with the conveniece of a local plant right here in New England turned out to be a real benefit in the prompt turn around on both the shop drawings and the wide array of products needed on the jobsite.